- Home
- Government
- Departments
- Regulatory Compliance
- Code Compliance
- Portable on Demand Storage Units
Portable on Demand Storage Units
Permit Application
- PODS Unit Permit Application (PDF)
- OR, use the online form at the end of the page
Applications can be completed and emailed to the Department of Regulatory Compliance at regulatory.compliance@mansfieldtexas.gov or delivered to the Chris W. Burkett Service Center, located at 620 S. Wisteria St. Mansfield, Texas 76063.
Portable On Demand Storage Units Ordinance
When placed improperly or for long periods of time, storage units can damage your property or impact traffic. If you're planning to use a portable on demand storage (PODS) unit, be sure to fill out an online permit application today!
PODS unit permits are valid for up to thirty (30) days. One (1) extension for up to thirty (30) days may be granted upon written request to and approval by the Regulatory Compliance Department. No more than one (1) unit may be placed on a property, and no more than one (1) permit may be issued per twelve (12) months.
Give us a call if you have any questions at 817-276-4221.
PODS unit placement:
- Cannot obstruct vehicular or pedestrian traffic
- Must minimize interference of sight lines for motorists on adjoining streets or nearby driveways
- Cannot encroach on drainage easements/areas of rights-of-way
- Cannot cause a person to have to detour from walking on the sidewalk into the street in order to get around the unit
- Cannot cause hazardous conditions or a threat to public safety, or any detriment to surrounding land use or development
- If possible, should be placed toward the rear of the property line
- No more than one (1) unit is allowed
- Must be placed on an improved surface, which is a stable base that is not in danger of water run-off or flooding
- Shall be secured from entry by children or the general public while unattended
After approval of your application, and payment of the fee ($5.00), you will receive a permit valid for 30 days from the date of issuance. The permit must be affixed to the exterior of the unit for the duration of the permit period. Payment may be made by cash, check, or money order to the City of Mansfield C/O Regulatory Compliance Department at the above address. If you would like to pay via an online payment link, please contact our office.
Cuando se colocan incorrectamente o durante largos períodos de tiempo, los contenedores pueden dañar la propiedad o afectar el tráfico. ¡Si planea usar una unidad de almacenamiento portátil, asegúrese de completar una solicitud de permiso en línea hoy!
Los permisos son válidos hasta por treinta (30) días. Se puede conceder una (1) prorroga de hasta treinta (30) días previa solicitud por escrito y aprobación del Departamento. No se puede colocar más de una (1) unidad en una propiedad, y no se puede emitir más de un (1) permiso cada doce (12) meses.
Llámenos si tiene alguna pregunta a 817-276-4221.
Colocación de PODS:
- No debe obstruir el tráfico vehícular o peatonal.
- No debe interferir con la visibilidad de los automovilistas en calles adyacentes o en las entradas de vehículos cercanas.
- No debe invadir áreas de drenaje o de derecho al paso.
- No puede hacer que un peatón se desvie a la carretera para rodear la unidad.
- No debe poner en peligro la seguridad pública o causar daños al terreno o infraestructura en general.
- Si es posible, debe colocarse en la parta trasera de la propriedad.
- Solo se permite una unidad de almacenamiento porátil (POD).
- Debe colocarse en una superficie estable y que no esté en peligro de deslave o inundación.
- Debe impedir la entrada a niños o al público en general mientras esté desatendida.
Después de la aprobación de su solicitud y el pago de la tarifa ($5.00), recibirá un permiso válido por 30 días a partir de la fecha de emisión. El permiso debe colocarse en el exterior de la unidad durante el período del permiso.